The CCTV system at Downsview school was originally installed in 2002 and although the system was still operational, due to the technical limits of the cameras and recording equipment, the system was only capable of provided low-quality images.

Steve Cooke the school premises manager explains the project brief. We have been wanting to upgrade the CCTV system for some time but we were unsure of the exact options that were available to us. The main consideration for us was the need to improve the image quality, but as with all projects, the budget was also a key element

download complete case study (pdf)